Lockheed Martin subsidiary Sikorsky was awarded a $1 billion contract modification to build CH-53K King Stallion heavy-lift helicopters for the U.S. Marine Corps. The $1.13 billion contract modification, awarded by the Navy, is for 12 Lot 2 and 3 low-rate initial production King Stallions as part of the 200 program of record aircraft for the Marine Corps, Lockheed Martin said [https://news.lockheedmartin.com/2019-05-17-Sikorsky-Receives-Contract-to-Build-12-CH-53K-Heavy-Lift-Helicopters] on Friday, May 17. The contract includes programmatic support, logistics support, and peculiar support equipment, the Department of Defense said [https://dod.defense.gov/News/Contracts/Contract-View/Article/1851665//]. Sikorsky will begin deliveries in 2022. CH-53K KING STALLION The King Stallion can carry up to 27,000 lbs (12,200 kg) over 110 natural miles (204 km), more than tripling the load of Sikorsky’s CH-53E helicopter. Sikorsky CH-53K King Stallion helicopter. Image: Lockheed Martin [https://www.thedefensepost.com/wp-content/uploads/2019/05/Sikorsky-CH-53K.jpg] Sikorsky CH-53K King Stallion helicopter. Image: Lockheed Martin Developed for the U.S Marine Corps, is the only sea-based, long-range, heavy-lift helicopter in production. Sikorsky promotes the CH-53K for expeditionary heavy-lift transport of armored vehicles, equipment, and personnel to support distributed operations inland from a sea-based center of operations, as well as support for special operations forces, humanitarian missions and combat search-and-rescue. Initially intended to be delivered in 2018, the helicopter was delayed [http://time.com/5484497/marines-king-stallion-helicopter/] due to technical issues in the design that required a major restructuring of the program. The King Stallion is expected to be declared combat-ready in 2020 and to be deployed within three years.