Northrop Grumman, the prime contractor for the US Navy's MK 54 MOD 2 Advanced Lightweight Torpedo [https://thedefensepost.com/2026/04/14/mk54-lightweight-torpedo-guide/], has tapped Karman Space & Defense to support the program’s Fleet Exercise Section (FES). The $21.3-million contract covers the proof of manufacture phase, during which Karman will validate the FES’ design, manufacturing, and testing processes before the program advances to low-rate initial production. The program is a recoverable training configuration that replaces the torpedo's live warhead with a non-explosive exercise and recovery assembly, allowing the US Navy to safely conduct anti-submarine warfare training, collect performance data, and reuse the system in future exercises. “The FES is an innovative solution to a complex challenge that Karman developed, tested, and is now poised to produce for the Navy,” said [https://karman-sd.com/news/karman-space-defense-awarded-northrop-grumman-contract-mk54/] Jon Rambeau, Karman CEO. “Serving our nation’s military needs is core to our mission and drives our team to achieve the impossible every day,” he added. MK 54 MOD 2 The MK 54 MOD 2 advanced lightweight torpedo can be launched from naval and airborne platforms, including surface ships, MH-60R helicopters, and P-8 Poseidon patrol aircraft, to track, classify, and strike subsurface targets. It was designed under a collaborative agreement with the US Navy and the Australian Defence Force, with Northrop Grumman as the prime contractor [https://thedefensepost.com/2026/01/13/northrop-grumman-mk54-mod2/] and L3Harris Technologies developing the torpedo’s propulsion subsystem [https://thedefensepost.com/2025/08/08/l3harris-advances-us-navys-next-gen-torpedo-with-successful-propulsion-test/].