The US Army has formally named its Future Long-Range Assault Aircraft (FLRAA) the “Cheyenne II,” following its technical designation of MV-75 [https://thedefensepost.com/2025/05/16/us-armys-next-gen-flraa-gets-official-name-first-unit-assignment/] in May 2025. The Cheyenne II draws [https://www.army.mil/article/291686/u_s_army_announces_popular_name_for_the_mv_75_flraa_cheyenne_ii] its name from the federally recognized Cheyenne and Arapahoe tribes in Oklahoma and the Northern Cheyenne tribe in Montana, whose history is marked by adaptability, resilience, and a strong warrior ethos. Naming the incoming FLRAA Cheyenne II sticks to the army tradition of naming its rotorcraft after Native American tribes and figures, such as the UH-60 Black Hawk [https://thedefensepost.com/2026/04/15/us-black-hawk-procurement/], AH-64 Apache [https://thedefensepost.com/2026/03/25/us-army-launched-effects-apache/], and UH-72 Lakota. The announcement was made during the Army Aviation Association of America’s annual conference. MV-75 CHEYENNE II As they faced displacement and shifting threats, the Cheyenne adapted, reorganized, and endured, qualities the army says are reflected in the aircraft’s design and role. The MV-75, based on Bell’s 280 Valor tiltrotor [https://thedefensepost.com/2022/12/06/bell-textron-assault-aircraft/] and featuring a modular open systems approach and digital backbone, mirrors these traits through its roughly doubled speed and range compared to existing army rotorcraft, as well as its multi-mission flexibility. “The name also reflects a connection to the bold vision of the AH-56 Cheyenne, while ‘II’ signifies a new era of innovation and capability. It is a name that pays tribute to an indomitable warrior spirit and signals a decisive step forward for Army aviation,” said [https://investor.textron.com/news-releases/news-details/2026/Future-Long-Range-Assault-Aircraft-Officially-Named-MV-75-Cheyenne-II-2026-JnB_U36oGJ/default.aspx] FLRAA Project Manager COL Jeffrey Poquette. Meanwhile, Ryan Ehinger, Senior VP and program director of FLRAA at Bell, called the development a “significant milestone that comes right as we are accelerating assembly and production to deliver the MV-75 capability to warfighters faster.” Initial operational capability is slated for fiscal year 2030, although US Army officials have been working to move the timeline earlier, according [https://breakingdefense.com/2026/01/army-says-first-mv-75-tilt-rotor-helo-to-be-delivered-by-end-2026-for-testing/] to a January report by Breaking Defense.