India’s state-backed Mazgaon Dock Shipbuilders Limited (MDL) delivered the first Project (P) 15B stealth guided-missile destroyer to the country’s navy last week. The first of the four 7,400-ton indigenous naval vessels — commissioned the Visakhapatnam — was built as part of a contract signed in 2011, The Times of India revealed [https://timesofindia.indiatimes.com/india/india-gets-new-destroyer-but-china-continues-to-widen-the-gap/articleshow/87439312.cms], adding that the vessel’s delivery is over three years late. The outlet added that all the P15B vessels, including their weapons systems, will cost the government over 350,000,000,000 Indian rupees ($4.6 billion). WEAPONS Last year, the government approved [https://timesofindia.indiatimes.com/india/navys-4-under-construction-destroyers-to-get-lethal-weapons-sensors-package/articleshow/73259960.cms] weapons and sensors systems worth 6,150,000,000 Indian rupees ($820 million) for the vessels, including upgraded-range BrahMos supersonic cruise missiles, Barak surface-to-air missile systems, 127 mm main guns, and rocket launchers. According to PSU Watch, the ship is also equipped [https://psuwatch.com/mdl-delivers-first-ship-of-four-stealth-guided-destroyer-to-indian-navy] with indigenously developed anti-submarine weapons and sensors for underwater warfare such as “Hull-mounted Sonar Humsa NG, Heavyweight Torpedo Tube Launchers, and Rocket Launchers.” The P15B (Visakhapatnam-class) destroyers are an upgrade on the three Project 15A (Kolkata-class) destroyers, which came after the three Delhi-class vessels currently operated by the Indian Navy. The remaining vessels are expected to be inducted by 2025. FEATURES The Visakhapatnam-class destroyer can accommodate a crew of 312 and can travel 4,000 nautical miles (7,408 kilometers) without refueling, PSU Watch reported [https://psuwatch.com/mdl-delivers-first-ship-of-four-stealth-guided-destroyer-to-indian-navy], citing MDL. Its top speed is 30 knots (approximately 55 Kmph or 34 Mph).